d36 property
For Belinda Sullivan · D'Ettorre Real Estate

902/209 Castlereagh Street, Sydney

Belinda, thanks for this morning. Everything for the campaign is here: the photos to download, the facts, what buyers will ask, the evidence, the paperwork and the plan to launch mid October.

2 bed2 bathLevel 9Balcony to Hyde ParkStorage cageNo car space
Balcony view to Hyde Park
01

The apartment

Current photos, straightened. Final styling 13 October.

Living room looking out to Hyde Park
Living, Hyde Park outlook
Balcony
Balcony
Kitchen
Kitchen
Living
Living
Kitchen from the entry
Kitchen from the entry
Main bathroom
Main bathroom
Robe and ensuite
Robe and step free ensuite
Entry hall
Entry hall
Street entrance
Street entrance
Tap a photo to view full size. Straightened, best quality.
02

The facts

Two bedrooms and two bathrooms, with a Hyde Park outlook.

Title
Lot 26 in Strata Plan 92304. Storage cage in Basement 1 on title. No car space
Building
The Castlereagh, completed 2015. 50 apartments over 4 shops and 4 offices. Entries on Castlereagh and Bathurst Streets
Layout
2 bed, 2 bath, level 9. Bedrooms split either side. Balcony, walk in robe to a step free ensuite, full height glass
Outgoings
About $245 a week. Strata $10,489.68, council $1,344.30, water $904.80 a year
Strata
Certificate dated 1 Oct 2026, nothing owing. No one off levies. Insured with Chubb to June 2027. Managed by Titles Strata Management
Pets
Cats, small dogs and caged birds allowed on notice to strata
Inclusions
Stove, range hood, dishwasher, light fittings, fixed floor coverings. Blinds to be confirmed
Terms
Vacant possession, 10% deposit. Settlement flexible, shorter preferred
Vendor
Our client, represented by d36 property. All vendor communication through Dineth. Conveyancer details to follow
Storage
Cage in the basement, free to hold anything moved out for styling
03

Outgoings

$245 a week all in. Strata and council are clear.

Buyers and their brokers price an apartment off the outgoings as much as the asking number. These are clean, so lead with them in the listing.

OutgoingDetailPer year
Strata levies$2,622.42 a quarter. Running costs $1,661.96, long term repairs $960.46, includes GST$10,489.68
Council rates2026/27. General rate $734.80, rubbish twice weekly $597.00, stormwater $12.50$1,344.30
Water$226.20 a quarter. Water $26.65, wastewater $189.88, stormwater $9.67$904.80
TotalAbout $245 a week$12,738.78
Council values the land share at $689,315. The strata certificate of 1 October confirms nothing owing, no one off levies and no interest. Strata manager is Titles Strata Management. Next levy is due 1 October, adjusted at settlement. The water account is being squared away before launch.
04

The cladding works

Street level only. Nothing goes up the tower.

The builder starts on 6 October, replacing the flammable cladding on the ground level facade, the awning and the awning soffit. Worked from a lift platform, no scaffolding up the building, footpaths open throughout. Level 9 is untouched.

6 Oct 2026
Start
12 weeks
Stage 1, awning
8 weeks
Stage 2, facade
24 Feb 2027
Programmed finish

How it runs

  • In 6 metre sections, starting at the south end of the Castlereagh Street frontage, north to the Bathurst corner, then west along Bathurst
  • Each section: fence off, remove, engineer checks, install, move on. Six sections per stage
  • Hours: 7am to 5pm weekdays, Saturdays only if needed, never Sundays or public holidays
  • Weather is the main risk to the finish date. The builder says so themselves

Who's running it

  • Builder: Mars Residential Projects, licensed
  • Independent inspector: Landlay, checks the work for the owners
  • Owners' side: the building manager
  • Weekly site meetings, and the building's condition recorded before work starts
05

Disclosure

The vendor paid their share upfront. The buyer of 902 pays nothing toward the cladding loan.

22 owners paid their share upfront. The rest are repaying a 10 year loan through their strata levies. 902 is one of the 22, and that benefit passes to the buyer.

DocumentWhat it provesOur copy
Signed works contractThe job is committed and priced, not proposedCopy to get
Builder's insuranceOwners are covered if the builder can't finish or fix defectsCopy to get
Design sign offDesigns lodged with NSW Fair Trading, as requiredCopy to get
Notice, meeting report, programmeScope, dates and hours in writing, finishing 24 Feb 2027In hand
Building loan contractThe building borrowed $647,955 over 10 years from Firstrata for the cladding. Signed 17 June 2026In hand
Strata certificate, 1 Oct 2026Nothing owing on 902, no one off levies, building insured to June 2027In hand
Vendor's cladding bill and receipts$30,129.10 paid in full, 3 and 5 June 2026In hand
$0
Loan repayments on 902. The vendor's upfront payment covers this apartment's share for the full 10 years
About $4,700 a year
What an apartment like 902 pays for 10 years without paying upfront, at today's 9.45% rate
Passes to the buyer
The upfront payment stays with the apartment when it sells
$1.16M project
Total cost of the works, paid by the loan plus upfront payments
06

Why buyers will want it

A park outlook, two real bathrooms and nothing to pay toward the cladding.

Hyde Park outlook

The balcony and living room look down Bathurst Street to Hyde Park. Shoot it at twilight, it's the hero image.

Cladding already paid

Our client paid their share of the cladding works upfront. The buyer pays nothing toward the building's 10 year cladding loan. Owners who didn't pay upfront are paying about $4,700 a year.

Step free ensuite

Walk in robe through to a step free shower with a grab rail. A real plus for downsizers and anyone planning to stay long term.

The larger two bed

This apartment's share of the building is 237 of 10,000. One beds here sit at 138 to 170, so this is the bigger floor plan.

Rare in the building

About one two bed resale a year. Buyers who want this building don't get many chances.

Town Hall at the door

Town Hall station about 220m away, the Galeries about 260m, with cafes at street level.

07

What buyers will ask

Get ahead of these five in the listing and at the first open.

QuestionThe answer
Is there a car space?No. Say it plainly in the listing, with the nearest monthly parking beside it. Domain currently shows a car space and needs fixing before launch.
What are the works out front?Cladding replacement at street level only: ground floor facade and awning, 6 Oct 2026 to 24 Feb 2027. No scaffolding up the tower, footpaths stay open, nothing happens on level 9. Works contract signed, builder insured, designs lodged.
Will I pay for the cladding?No. The vendor paid their $30,129.10 share upfront in June 2026 and that benefit stays with the apartment.
Anything on the strata certificate?Nothing owing on 902. The certificate also shows a balance between the residential strata and the building committee. We're getting strata to confirm in writing what it is, so you'll have the answer before anyone asks.
The fire station?It's next door. Buyers will hear it, so mention it rather than let them find it.
08

Sales evidence

This line has resold between $1.13M and $1.235M since 2018.

UnitLineSoldPrice
120202, same lineJul 2025$1,150,000
160101Aug 2024$1,250,000
70202, same lineSep 2021$1,210,000
130202, same lineMar 2021$1,130,000
100202, same lineAug 2020$1,235,000
150202, same lineJun 2018$1,165,000

Listings you flagged

  • 2 bed, 2 bath, Bathurst St, guiding $1.2M to $1.3M
  • 2 bed, 1 bath, Clarence St, guiding $1M
  • Kent St and Elizabeth St, price on request
09

Documents

What we have, and what's still coming for the contract.

In hand

  • 2016 contract: title, strata plan, building rules
  • Strata certificate and owner account, 1 Oct 2026
  • Strata levy notice, October 2026
  • Council rates notice, 2026/27
  • Sydney Water bill, September 2026
  • Builder's notice to residents and works programme
  • Cladding site meeting report, 20 Aug 2026
  • Building loan contract for the cladding
  • Vendor's cladding bill and payment receipts

Still to come

  • Current title searchConveyancer
  • Updated council certificateConveyancer
  • Sewer diagramConveyancer
  • Strata records and meeting minutesConveyancer
  • Cladding contract, insurance, design sign offConveyancer
  • Building committee balance explainedDineth
  • Water account clearedVendor
  • Floor plan, from your photographerYou
10

Campaign plan

Your photographer straight after 13 October, live mid October.

2 Oct

Our call

5 Oct

Vendor back in Sydney

6 Oct

Street level works start

13 Oct

Final styling

From 14 Oct

Photos and floor plan

Mid Oct

Launch

Nov to Dec

Offers, exchange, settlement

Access

Vacant, but the vendor may stay the odd Tuesday or Thursday night for work, with a clean before and after. Midweek opens are fine. Give Dineth notice of any private inspection.

Styling

Final styling is done on 13 October. Black couch is gone, second bedroom is a study with a sofa bed. Open to a more modern rug, flowers or anything else you suggest.

Ensuite

The vendor has decided to present it as is, no new screen. Show us how you'd shoot and talk about it, and price a screen so it can't be used to push the price down.

11

Next steps

We go through your proposal with our client this weekend.

  • Today: formal appraisal and recommended price guide
  • Today: draft ad schedule: your photographer vs Domain's package, REA standard vs Lux Listing, setup and AML fees
  • Your call: private treaty or auction, and whether a coming soon week makes sense first
  • Before launch: remove Domain's car space, list the nearest monthly parking, cladding wording to Dineth for sign off
  • Any buyers in the building you know of, let's talk to them first

Dineth Ekanayake · Director, d36 property
0404 901 345 · dineth@d36property.com.au · www.d36property.com.au